Pendhar Metro Station is visible in this image.

Pendhar Metro Station Line 1, Taloja

             Pendhar Metro Station is a crucial station of Taloja along Line 1 of Navi Mumbai Metro that marks the endpoint of the 11.1 km stretch connecting Belapur to Pendhar. This line was inaugurated in November 2023 and marks the long-awaited start of the Navi Mumbai metro project, boosting urban connectivity and reducing commute delays.

Key Features of Line 1:

Pendhar Metro Station is visible in this image.
  • Route: The number Line 1 has 11 stations and spans Kharghar functioning through the key residential and commercial nodes in the area.
  • Connectivity: It provides seamless connectivity to India’s existing suburban rail network in Navi Mumbai, i.e., the Harbour Line, enabling easy travel to Mumbai city and adjacent areas.
  • Travel Time: The entire stretch takes about 20 minutes via train, which is much conducive for travel when compared to much slower road travel.
  • Modern Facilities: A/C coaches are fitted with CCTV cameras and ramps have also been provided for the differently-abled for maximum safety and easy boarding of passengers.

Navi Mumbai Metro Line 1 Budget Overview

Importance of Pendhar Metro Station:

          Pendhar Metro Station is not only a terminal but serves as an access point to the Taloja industrial belt, 5.5 km away from Taloja jail, joining up with this economically significant area to the other areas of Navi Mumbai. Pendhar also provides support in last-mile connectivity with feeder buses and parking for personal vehicles, making it convenient for the passengers.

Project Cost Breakdown

          The original project cost, estimated in 2010, was ₹2,600 crores. However, by the time the project was completed in 2023, the total expenditure rose to ₹3,115 crores. The increase in cost was primarily due to delays and rising construction expenses.

Funding Sources

The funding for the project came from multiple sources:

  • CIDCO (City and Industrial Development Corporation): CIDCO was the primary agency responsible for planning and financing the project.
  • Loans from Financial Institutions: Additional financing was secured through loans from Indian financial institutions and development banks.
  • Public-Private Partnerships (PPP): Certain sections of the project’s operations and maintenance were facilitated through Public-Private Partnerships (PPP) models.

When Development Started?

          The development of Navi Mumbai Metro Line 1 officially began in 2011. The project was initiated under the supervision of CIDCO (City and Industrial Development Corporation), with the goal of addressing the growing transportation needs of Navi Mumbai’s rapidly expanding population.

Key Milestones:

  • 2010: Initial planning and feasibility studies were conducted. CIDCO prepared a detailed project report (DPR) for the metro line.
  • 2011: Foundation work and civil construction officially commenced. The construction of viaducts and elevated structures started.
  • 2014: Initial trials and testing of track alignment and partial systems were carried out, but construction delays pushed the timeline forward.
  • 2017–2020: Progress stalled due to multiple factors, including funding challenges, land acquisition issues, and contractual delays.
  • 2021–2023: The project gained momentum, with significant progress in infrastructure completion, rolling stock procurement, and signaling systems installation.

Challenges Faced During Development:

  • Land Acquisition Delays: Securing land for stations and depots caused significant slowdowns.
  • Funding Shortfalls: Cost escalations led to reallocation of budgets and additional approvals.
  • COVID-19 Pandemic: Work slowed down during 2020-21 due to labour shortages and supply chain disruptions.

When Development Finished?

           The development of Navi Mumbai Metro Line 1 was officially completed in November 2023. After a prolonged timeline involving several delays and challenges, the metro line was inaugurated on November 17, 2023, marking the commencement of operations for the public.

Why Was Pendhar Chosen as a Terminal?

          Pendhar was strategically selected as the terminal for Navi Mumbai Metro Line 1, owing to its geographic location, connectivity potential, and importance in Navi Mumbai’s urban and economic development. Below are the key reasons for choosing Pendhar as the terminal station.

When Development Finished?

           The development of Navi Mumbai Metro Line 1 was officially completed in November 2023. After a prolonged timeline involving several delays and challenges, the metro line was inaugurated on November 17, 2023, marking the commencement of operations for the public.

Why Was Pendhar Chosen as a Terminal?

            Pendhar was strategically selected as the terminal for Navi Mumbai Metro Line 1, owing to its geographic location, connectivity potential, and importance in Navi Mumbai’s urban and economic development. Below are the key reasons for choosing Pendhar as the terminal station:

Proximity to Taloja Industrial Area

            Pendhar is located close to the Taloja MIDC (Maharashtra Industrial Development Corporation) area, one of Navi Mumbai’s major industrial hubs. The Pendhar Metro Station serves as a vital connection point for workers and commuters traveling to and from this industrial zone, facilitating an eco-friendly and efficient transport option.

Future Urban Expansion

            The area around Pendhar is identified for significant future urban growth, including residential and commercial development. Given this expected growth, Pendhar is poised to serve as a crucial terminal that will accommodate the increasing population and the demand for transportation.

Improving Last-Mile Connectivity

            Pendhar acts as a hub for various modes of transportation, including buses and private vehicles. Its role as the terminal station ensures improved last-mile connectivity for commuters, particularly those traveling to and from the nearby residential and industrial areas.

Ease of Land Acquisition

            In comparison to other potential locations, Pendhar presented fewer challenges related to land acquisition. This made it a more viable option for the construction of essential infrastructure, such as the metro depot for train maintenance and storage.

Facilitating Regional Integration

            Positioning Pendhar as the terminal enhances its potential as a key junction for future metro line extensions. This forward-thinking strategy aligns with plans for regional integration, where Pendhar could serve as a pivotal point for expanded metro connectivity.

Strategic Planning by CIDCO

            CIDCO’s urban development strategy aimed at creating balanced connectivity across Navi Mumbai. Pendhar’s selection fits well with CIDCO’s vision to develop key urban nodes, such as Kharghar and Taloja, and to provide connectivity to surrounding areas.

Key Features of Pendhar Metro Station

            Pendhar Metro Station is a modern transit hub on Line 1 of the Navi Mumbai Metro, designed to provide a seamless commuting experience. Here are its accurate and standout features.

Strategic Location

  • Acts as the terminal station for Line 1, connecting key areas like Belapur, Kharghar, and Taloja MIDC.
  • Located near the Taloja industrial zone, making it convenient for industrial workers and commuters.

Infrastructure and Design

  • Elevated Station: Constructed on an elevated platform to optimize space and avoid road-level congestion.
  • Modern Architecture: Designed for aesthetic appeal and functionality with a focus on passenger comfort and safety.

Passenger Amenities

  • Air-Conditioned Coaches: Trains stopping at Pendhar station feature fully air-conditioned coaches for a comfortable journey.
  • Accessibility Features:
    • Ramps and elevators for senior citizens and differently-abled passengers.
    • Clear signage and tactile tiles for the visually impaired.
  • Parking Facilities: Ample parking space for two-wheelers and cars, ensuring seamless last-mile connectivity.

Safety and Security

  • CCTV Surveillance: Comprehensive coverage for passenger security.
  • Emergency Systems: Fire alarms, smoke detectors, and dedicated emergency exits ensure safety in unforeseen situations.
  • Station Guards: Deployment of trained personnel for assistance and monitoring.

Connectivity

  • Integration with Other Transport Modes:
    • Links to the Harbour Line of Mumbai suburban railways via Belapur.
    • Feeder bus services and shared auto-rickshaws for last-mile connectivity.
  • Travel Time Advantage:
    • Reduces travel time significantly between Belapur and Pendhar, with the entire 11.1 km journey completed in about 20 minutes.

Eco-Friendly Operations

  • Powered by energy-efficient systems to minimize carbon footprint.
  • Features provisions for water conservation and waste management.

Daily Operations

  • Operating hours: 6:00 AM to 10:00 PM.
  • High frequency of trains ensures reduced waiting time for passengers.

Daily Passenger Capacity and Footfall of Pendhar Metro Station

Designed Passenger Capacity

  • The station is equipped to handle approximately 15,000 to 20,000 passengers daily during peak operations.
  • This capacity is supported by its spacious platforms, multiple ticketing counters, and efficient entry/exit systems to minimize congestion.

Initial Footfall Trends (2023-2024)

  • Since its inauguration in November 2023, Pendhar Metro Station has seen an average daily footfall of 10,000 to 12,000 passengers, which is expected to increase as commuters adapt to the metro system.
  • Peak hours (8:00 AM–10:00 AM and 6:00 PM–8:00 PM) witness higher footfall, primarily consisting of office workers, industrial employees from Taloja MIDC, and students.

Anticipated Growth

  • As the metro becomes an integral part of Navi Mumbai’s transportation network, daily footfall is projected to rise to 20,000–25,000 passengers by 2025.
  • Factors contributing to this growth include:
    • Expansion of nearby residential and commercial areas.
    • Increased awareness and adoption of metro services.
    • Planned extensions of Line 1 and integration with future metro lines.

Infrastructure to Manage Footfall

  • Multiple Gates and Escalators: Ensures smooth movement of passengers, even during peak hours.
  • Automated Systems: Smartcard-enabled ticketing and automatic fare collection gates help reduce wait times.
  • Real-Time Monitoring: CCTV surveillance and staff deployment to manage crowds effectively.

Comparative Analysis

  • Compared to stations like Belapur, which handles a larger commuter base due to its role as a transport hub, Pendhar sees moderate but steady growth in footfall, reflecting its position as a terminal and its proximity to the industrial zone.

Stops on the Metro Between Belapur and Pendhar

Belapur Metro Station

  • Located at the heart of the Central Business District (CBD) of Navi Mumbai.
  • Offers an interchange facility with the Harbour Line of Mumbai’s suburban railway.

Sector 7 Metro Station

  • Serves the commercial and residential sectors of Belapur.
  • Well connected to the local market for daily commuters.

Sector 11 Metro Station

  • Links key residential zones in Belapur.

Kharghar Metro Station

  • A major stop for students and visitors heading to educational institutions or attractions like Pandavkada Waterfalls.

Sector 14 Metro Station

  • Primarily serves the residential area of Kharghar.

Central Park Metro Station

  • Located near Central Park Kharghar, a popular recreational area.
  • Close to golf courses and upcoming developments.

Sector 34 Metro Station

  • Serves the dense residential hubs in the Sector 34 area of Kharghar.

Taloja Phase 1 Metro Station

  • Serves the Taloja MIDC industrial belt, by Taloja Phase 1 which is vital for workers and businesses.

Taloja Phase 2 Metro Station

  • Serves newly developing residential and commercial areas in Taloja.

Pendel Metro Station

  • A lesser-known station located at the edge of Taloja, primarily serving the commuter line.

Pendhar Metro Station

  • The last station and operational center for Line 1.
  • Equipped with feeder services and last-mile connectivity.

Line 1 Ticketing System and Metro Cards

Types of Ticketing Options

Passengers can choose from two main forms of ticketing:

  • Single Journey Tokens
    These are best for occasional travelers. Tokens can be purchased at ticket counters or automatic ticket vending machines available at all stations. They use RFID technology and need to be tapped at the entry gates and dropped at the exit gates.
  • Metro Smart Card
    The smart card is ideal for regular travelers, offering cost and time savings. It can be recharged with amounts ranging from ₹100 to ₹3,000. Smart cards offer reduced fares compared to single journey tokens and are valid across all stations on Line 1. They can be recharged either online or at designated counters.

Ticket Prices

  • Fares for the metro range from ₹10 to ₹40, depending on the distance. Discounts and concessions are available for students, senior citizens, and differently-abled persons.

Features of the Metro Smart Cards

  • Contactless Technology: The smart cards use NFC (Near Field Communication) technology, which ensures rapid and seamless entry and exit.
  • Recharge Options:
    • Online recharge is available through the official Navi Mumbai Metro app and website.
    • Station recharge can be done at recharge kiosks and ticket counters.
  • Convenience: The smart card saves time by eliminating the need to queue at ticket counters, especially during peak hours.
  • Multi-trip Passes: These are available with additional benefits for regular travelers.

Ticketing Infrastructure

  • Automated Fare Collection (AFC) Gates: AFC gates are installed at both entry and exit points to ensure quick and hassle-free entry and exit for smart cards and tokens, minimizing delays in passenger flow.
  • Ticket Vending Machines (TVMs): These machines are easy to use for purchasing tokens and recharging smart cards. They offer multiple language options and accept various payment methods, including cash and digital transactions.

Metro Timings and Frequency

First Metro Timings (Pendhar to Belapur CBD)

  • The first metro departs at 6:00 AM.

Last Metro Timings (Pendhar to Belapur CBD)

  • The last metro leaves the station at 10:30 PM.

Frequency of Metro

  • Peak Hours: Metro run every 7-10 minutes.
  • Non-Peak Hours: Metro run every 12-15 minutes.

Navi Mumbai Metro Line 1 Map

Proposed Extensions for Navi Mumbai Metro

Extension towards Kharghar

             The proposed route would extend from the existing Kharghar Metro Station to nearby residential and commercial areas in Kharghar. This extension would provide better access to educational institutions like Nirmal Lifestyle School and Kharghar Golf Course, as well as improved connectivity to inland residential areas.

Extension to Ulwe

             This extension proposes extending the metro line from Pendhar towards Ulwe, an area experiencing rapid residential development due to its proximity to the Navi Mumbai International Airport. The extension would enhance transport links for residents commuting to work and educational institutions, while boosting economic activity in Ulwe and surrounding areas.

Connection to the Navi Mumbai International Airport

             A proposed direct link would connect Belapur or Kharghar to the new Navi Mumbai International Airport. This direct route would provide easy access for airport commuters from various parts of Navi Mumbai, fostering regional growth by improving airport access.

Integration with Mumbai Metro

             This proposal envisions a connection between Navi Mumbai Metro and Mumbai Metro Lines 2 and 7, with interchanges at key nodes such as Belapur CBD or Kharghar. This integration would enable seamless transfers between the Navi Mumbai and Mumbai metro systems, improving regional connectivity and reducing travel time for commuters.

Extension to Airoli

             The metro line could be extended from Pendhar towards Airoli to provide better access for residents of Airoli and neighboring areas. This extension would improve connectivity to the Airoli railway station and other transport networks, supporting ongoing residential development in the region.

Future Planning and Considerations

             Each proposed extension will undergo thorough feasibility studies to assess factors such as traffic demand, environmental impact, and financial viability. Local stakeholders and residents will also be consulted to address their views and concerns about these new routes. Funding for the extensions is expected to come from a mix of government allocations, public-private partnerships, and financing from financial institutions.

Comparing Line 1 with Other Indian Metro Systems

Delhi Metro

  • Length: Over 390 kilometers-long (additional expansions are ongoing).
  • Number of Lines: 10 operational lines (including the Airport Express Line).
  • An advanced system for automatic train control.
  • Integration with other transport modes like buses and railways.
  • Daily ridership that often exceeds 3 million.
  • Technology: A combination of elevated and underground tracks with an extensive fare collection system.

Mumbai Metro

  • Line 1 (Versova-Andheri-Ghatkopar): 11.4 km (in operation since 2014).
  • An elevated line with smart card facilities.
  • Digitally served by daily riderships of around 50,000-100,000.
  • Future Plans: Under-construction additional lines to enhance connectivity throughout the city.

Bangalore Metro (Namma Metro)

  • Approximate length: 76 km (further extensions in progress).
  • Number of Lines: 2 operational lines.
  • A combination of elevated and underground sections.
  • Integration with bus services for good last-mile connectivity.
  • Approximate daily ridership is about 600,000.
  • Technology: Smart card system, automated ticket vending machines, and real-time information displays.

Kolkata Metro

  • More than 30 km-long (India’s first underground metro).
  • Underground routes are older; it right down through downtown.
  • Daily ridership of around 700,000.
  • Technology: Conventional metro technology with limited modern systems mix.

Chennai Metro

  • Approximate length: 54 km (in operation and extension underworks).
  • Mixes elevated and underground sections that are to be connected with a network of suburban railways.
  • Daily ridership averaging around 100,000-200,000 daily.
  • Technology: An advanced signalling system and automation of payment issuance.

Navi Mumbai Metro Line 1

  • Length: 11.1 kilometers-long (in service from November 2023).
  • An elevated line establishing connection of major destinations, including Belapur and Pendhar, principally intended for the suburban commuter.
  • Capable of carrying 15,000-20,000 passengers daily, with further enhancement expected in the future.
  • Technology: Smart cards, automatic fare collection, and modern amenities for passenger comfort. Providing integrations within the coming Navi Mumbai International Airport and interchange with arranged transportation systems.

Impact of Upcoming Metro Lines on Pendhar Station

Enhanced Connectivity

  • Integration with Future Metro Lines: Anticipated upcoming metro lines will soon connect Pendhar with major transit nodes, including potential extensions from Pendhar to Ulwe, Navi Mumbai International Airport, and other areas such as Airoli. This will position Pendhar as a key transfer point in the region.
  • Seamless Transfers: The station is expected to feature interchanges for smoother transitions between lines, reducing commuting time for trips across Navi Mumbai and Mumbai.

Increased Passenger Footfall

  • Boosted Ridership: With the anticipated launch of new metro lines, daily footfall at Pendhar Station is expected to increase significantly, turning it into a central hub for onward connections.
  • Support for Residential Development: Enhanced connectivity will attract more residents to Pendhar, driving demand for metro services and supporting residential growth in the area.

Economic Growth in the Region

  • Real Estate Development: The improvement in connectivity is likely to spur real estate activities in and around Pendhar. As development picks up, property prices in the area are expected to rise, with both residential and commercial properties coming up.
  • Industrial and Commercial Growth: Enhanced access to the Taloja industrial belt is likely to support industries in retaining workers and driving economic growth in the area.

Reduced Traffic Congestion

  • Rail to Road Use: Improved metro connectivity will encourage commuters to shift from private vehicles to public transport, easing traffic congestion and reducing pollution in the area.
  • Improved Last-Mile Connectivity: Integration with feeder services and bus routes will make transfers easier, improving last-mile connectivity for passengers.

Improved Infrastructure at Pendhar Station

  • Facility Upgrades: As footfall increases, Pendhar Station is expected to undergo upgrades, including more ticket counters, escalators, and expanded waiting areas.
  • Technology Integration: Advanced systems for real-time train tracking and passenger management are likely to be implemented to meet the growing demand.

Government’s Long-Term Vision for Navi Mumbai Metro

Comprehensive Metro Network

             The proposed multi-line metro network will connect key nodes such as Belapur, Kharghar, Taloja, Ulwe, and Panvel, as outlined by the government. Future metro lines will integrate seamlessly with existing transport systems, including suburban trains, buses, and the forthcoming Navi Mumbai International Airport.

Support for Urban Expansion

              As urban development accelerates in the region, the metro will play a crucial role in easing traffic congestion and improving mobility. The network will connect emerging hubs like Ulwe, Taloja, and Karanjade, fostering balanced regional development.

Sustainable and Green Transportation

             Focus on Green Transit: The metro system will reduce reliance on private vehicles, thereby curbing carbon emissions. Sustainable transportation will be emphasized through the use of solar energy for station power needs and the deployment of energy-efficient rolling stock.

Economic Development

              The metro’s connectivity to the Taloja MIDC industrial zone will boost business opportunities and create jobs. This will lead to property value appreciation, attract new investments, and drive the commercial growth of Navi Mumbai.

Enhanced Connectivity to Navi Mumbai International Airport

              A direct metro line to the Navi Mumbai International Airport will position the region as a vital transit hub, serving local residents, commercial travelers, and tourists. This will align with India’s broader vision of developing world-class infrastructure.

Smart Mobility Features

              The metro system will incorporate advanced digital technologies such as smart cards, mobile ticketing apps, and real-time tracking systems to enhance the rider experience. Future provisions will include driverless metro systems and AI-based crowd management solutions.

Regional Connectivity and Beyond

              The metro network will strengthen intra-region connectivity with Mumbai through metro interchanges and integrated transport corridors, facilitating easier travel across the region.

Regional Accessibility

              The metro network will connect Navi Mumbai with adjoining regions like Thane and Raigad, fostering better regional integration. This enhanced connectivity will play a crucial role in strengthening ties across neighboring areas, facilitating smoother travel and improving accessibility in the larger region.

Economic and Social Impact

  • Increased Accessibility: The metro will provide an affordable and easily accessible mode of transport, significantly improving the daily commute for residents and making travel less of a hassle.
  • Reduced Urban Divide: By connecting underdeveloped areas with more established regions, the metro system will help bridge the urban divide, encouraging more balanced growth and integration across urban and suburban areas.

Timeline and Funding

  • Phased Work: Metro development will be carried out in phases, starting with Line-1, allowing for gradual implementation and expansion.
  • Public-Private Partnerships (PPPs): The central government is actively seeking funding through PPPs to accelerate the metro projects and ensure their timely completion.

Future Challenges and Solutions

  • Infrastructural Scalability: As Navi Mumbai continues to grow, the metro system will need to expand in response to rising demand. This will involve scaling up infrastructure and incorporating new stations and extensions to meet the needs of a growing population.
  • Smooth Operation and Maintenance: To ensure stable operations, the metro will require advanced computerized systems and control mechanisms. Skilled personnel will be essential for maintaining the system’s efficiency and safety.
  • Environmental Concerns: To mitigate the environmental impact, a focus on “green technologies” will be prioritized. This will include energy-efficient rolling stock, solar-powered stations, and other eco-friendly solutions aimed at reducing the carbon footprint of urban transit development.

Conclusion

              Pendhar Metro Station on Line 1 will be a key catalyst for transformation in Navi Mumbai. Its strategic location will enhance connectivity, reduce travel time, and ease congestion, benefiting residents and businesses alike. By promoting economic growth, fostering balanced urban development, and embracing green technologies, the metro system will play a crucial role in shaping a more sustainable and accessible future for the region. Pendhar and Taloja will be at the heart of Navi Mumbai’s evolution, driving progress and improving the quality of life for all.

FAQ's

Frequently Asked Questions

What are the timings of the Metro service at Pendhar Station?

The timings of the Metro service at Pendhar Station are: Operating Hours: 6:00 AM to 10:00 PM. Frequency: Metro run every 15 minutes.

What is the fare for traveling to Pendhar Metro Station?

Usually ₹10 to ₹40, but the fare varies depending on the distance traveled. You can use the fare calculator on the Navi Mumbai Metro website or app to estimate the cost of your journey.

What are the safety measures in place at Pendhar Metro Station?

The station is equipped with CCTV cameras, security personnel, and emergency buttons for passenger safety.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top